
Mosman · Rear Extension
GY & Co checks the land, slope, access, drainage, heritage signals and CDC/DA pathway before detailed design begins.

Ground-Floor Extensions
In Mosman, rear extensions often need careful thinking around views, neighbours, slope, drainage, side access, mature trees and older building fabric. We test the practical constraints first, then shape the design around what can realistically be approved and built.
Mosman FAQ
A rear extension may be possible in Mosman, but the site needs to be checked first. Slope, heritage, trees, stormwater, privacy, access and Mosman Council controls can all change the answer.
It may be CDC only if all complying development rules are met. Many Mosman sites need DA because of heritage, slope, views, privacy, stormwater or other constraints.